2024-CME-212

Lot 20 Redesign and Construction

Authors: Daniel Nolasco, Kevin Viera, Jose Meza Ontiveros, Kelvin Bachicha, Elijah Manjarrez

Faculty Supervisor: Zhaoshuo Jiang

Department: Engineering

We are building a model concrete parking and designing a full scale parking lot to build our model in accordance with. The objective is to take to inadequacies that are prevalent in Lot 20 based on our surveys and redesign a new and improved Lot 20. We plan to make the model a relatively comprehensive representation of the design